Status

 

 

The Thinking Telescope project has been underway since a development mandate in October 2004. We have the advantage that elements of our hardware and communications system can be leveraged from existing projects; therefore great progress has been made in this short time period.

 

 Operational

Hardware:

RAPTOR System is fully operational. Responding to alerts and acquiring data

 

Database:

Operational - Data is being merged into SkyDot

 

Machine Learning:

  •  Systems for image clean up and some processing

  •  Systems for GRB afterglow identification

 

Communication:

Operational, through TALONS

  •   System now using both VOEvent and Integer byte packet notification delivery

  •   Operational use of Transport and RTML protocols

  •   Gateway implemented with eSTAR for bidirectional communications

 

 

Next phases of development (underway)

Database:

Merging of SkyDot/TALONS and Web-based operations

 

Hardware:

Upgrades of existing follow-up hardware

  •  Installation of co-aligned 4 x 0.4m follow-up system (expected first light 8/2006)

  •  Installation of high speed 0.5m follow-up with polarimeter (expected first light 10/2006)

  •  Installation of 16 camera mosaic survey upgrade (~16 mag limit) (expected first light 11/2006) 

  •  Installation of 0.4m secondary follow-up (matches RAPTOR S) at LANSCE site (expected first light 3/2007)

Machine Learning:

Additional Machine Learning Systems

  •  Automated object classification

  •  Anomaly identification system

  •  Development of intelligent decision system to tie into TALONS and SKYDOT

 

 

Site Map  |

LOS ALAMOS NATIONAL LABORATORY
Operated by the University of California for the National Nuclear Security Administration ,
of the US Department of Energy . | Copyright © 1998-2004 UC | Disclaimer/Privacy

Contact Us: Webmaster

Last edited        06/21/2006